Subsidence correction work Product List and Ranking from 6 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jan 07, 2026~Feb 03, 2026
This ranking is based on the number of page views on our site.

Subsidence correction work Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jan 07, 2026~Feb 03, 2026
This ranking is based on the number of page views on our site.

  1. アップルハウス 本社 Aichi//Building Management
  2. ジオラフター Chiba//Other construction industries
  3. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  4. 4 null/null
  5. 5 平成テクノス Osaka//others

Subsidence correction work Product ranking

Last Updated: Aggregation Period:Jan 07, 2026~Feb 03, 2026
This ranking is based on the number of page views on our site.

  1. Flexibly respond to ground and tilting conditions! 'List of Types of Settlement Repair Construction Methods' アップルハウス 本社
  2. For those troubled by sloping floors! Foundation repair work for floors where spheres roll! アップルハウス 本社
  3. Are you having trouble with "puddles in the garden" that don't drain well? 'Settlement Repair Work' アップルハウス 本社
  4. 4 Helpful Material: "Settlement Repair Work - Explanation of Terms and Various Methods" ジオラフター
  5. 4 [Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡

Subsidence correction work Product List

1~28 item / All 28 items

Displayed results

[Construction Case] Slab Foundation House: Settlement Correction Work (Kyoto Prefecture)

Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.

Here is an example of "settlement correction work" performed on a slab foundation house located in Kyoto Prefecture. This case involves a house that sank due to ground subsidence, resulting in warped door frames and gaps. The slab foundation house, which experienced a maximum settlement of 46mm, was corrected in 2.5 days. 【Case Overview】 ■ Maximum Settlement: 46mm ■ Area: Kyoto Prefecture ■ Construction Period: 2.5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Slab Foundation House: Ground Settlement Correction Work Due to Earthquake (Ibaraki Prefecture)

A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.

Here is an example of "settlement correction work" carried out on a flat foundation house located in Ibaraki Prefecture. This house was newly built and experienced a maximum settlement of 500mm due to the Great East Japan Earthquake. Due to the significant tilt, we used a combination of the up-con method and the single-pipe pile driving method for the correction. 【Case Overview】 ■ Maximum Settlement: 500mm ■ Area: Ibaraki Prefecture ■ Construction Period: 10 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Slab Foundation House: Settlement Correction Work Due to Liquefaction - Site Tour

A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.

We would like to introduce a case of "settlement repair work" carried out on a shallow foundation house located in Urayasu City, Chiba Prefecture. The house sank due to the impact of the Great East Japan Earthquake. The maximum settlement of approximately 60mm was corrected in 1.5 days. Additionally, due to many requests from customers who wanted to visit our construction site, we held an open house at this site with the kind cooperation of our customers. Many people were able to visit the site. 【Case Overview】 ■ Maximum Settlement: Approximately 60mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 1.5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Kawasaki City, Kanagawa Prefecture)

Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.

We would like to introduce a case of "settlement correction work" carried out on a slab foundation house located in Kawasaki City, Kanagawa Prefecture. The homeowner, who purchased the property as a newly built house, was deprived of a comfortable living environment due to the tilting of the house caused by ground subsidence. Several methods for settlement correction were considered, but the homeowner chose to request the work from our company, which could quickly make the corrections without requiring a move. 【Case Overview】 ■ Maximum settlement amount: 107mm ■ Area: Kawasaki City, Kanagawa Prefecture ■ Construction period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Kanagawa Prefecture)

Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.

Here is a case study of "settlement repair work" carried out at a certain house with a slab foundation in Kanagawa Prefecture. Due to a maximum settlement of 66mm observed in one corner of the living room, polyurethane resin was injected under the slab foundation to implement the settlement correction. This time, the work was done in a house with very narrow space between neighboring properties, but our company can perform the work without the need for extensive construction, allowing for a short construction period without affecting the neighboring property. 【Case Overview】 ■ Construction Area: 40m² ■ Maximum Settlement Amount: 66mm ■ Area: Certain residence in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Helpful Material: "Settlement Repair Work - Explanation of Terms and Various Methods"

We are currently offering materials that clearly explain the sinking correction construction! The explanations cover terminology and various construction methods in an easy-to-understand manner!

Settlement correction work refers to the construction process that involves applying steel pipes or chemical injections to buildings that have tilted due to ground subsidence, in order to bring them closer to a level position. This document provides detailed information on "settlement correction work" for buildings that have tilted due to ground subsidence, as well as the "chemical injection method" applicable to slab foundations. 【Contents】 ■ Settlement Correction Work - What is settlement correction work? - What is ground subsidence? ■ Correction Methods - Steel pipe pile driving method (underpinning method) - Pressure-resistant slab method - Void injection filling method - Chemical injection method *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Ground foundation construction method
  • Renovation and repair methods
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sugar Factory: Filling Work for the Void Under the Concrete Floor in the Turbine Room

We receive requests because it can be constructed in a short period of time! Using urethane for subsidence correction.

We would like to introduce a case of "filling the voids under the concrete floor in the turbine room" at a sugar factory in Hokkaido. During excavation work next to the external building of the turbine room for another project, a void with a depth of 380mm was discovered under the concrete floor. Since a turbine is installed above in the building, we implemented void filling work as a measure to prevent subsidence. We injected polyurethane resin under the concrete floor in the turbine room to fill the voids, and after the injection, we confirmed the filling using a CCD camera, ensuring that the polyurethane resin was densely filled, and completed the work. 【Case Summary】 ■ Construction Area: Approximately 70m2 ■ Maximum Void Depth: 380mm ■ Construction Period: 1 day ■ Area: Kamikawa District, Hokkaido *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Earthquake-Induced Settlement Repair Work (Miyagi Prefecture)

Addressing the sinking of slab foundation houses due to earthquakes in a short construction period! A case where all areas were corrected to within -10mm.

We would like to introduce a case of "settlement repair work" conducted on a slab foundation house located in Sendai City, Miyagi Prefecture. Due to the impact of an earthquake, there was significant settlement from the bedroom towards the entrance. Cracks and gaps appeared in the columns and stairs of the entrance porch. All points, including a maximum settlement of 73mm, were corrected to within -10mm. 【Case Overview】 ■ Construction Area: Approximately 80m2 ■ Construction Period: 2 days ■ Maximum Settlement Amount: 73mm *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Slab Foundation House: Settlement Correction Work Due to Earthquakes and Liquefaction

Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.

We would like to introduce a case of "settlement correction work" performed on a slab foundation house located in Urayasu City, Chiba Prefecture. The slab foundation house experienced settlement due to liquefaction caused by the Great East Japan Earthquake. Living in a tilted house led to health issues such as poor physical condition. We corrected a maximum settlement of approximately 80mm over two days. 【Case Overview】 ■ Maximum Settlement: 80mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Gifu Prefecture)

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

We would like to introduce a case of "settlement repair work" carried out on a certain house with a flat foundation in Gifu Prefecture. There was a request to perform settlement repair before the exterior wall work, and we were contacted by the client. We injected resin under the flat foundation to carry out the settlement repair, completing the work in two days. 【Case Overview】 ■ Construction Area: Approximately 36m2 ■ Maximum Settlement Amount: 48mm ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work

The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.

We would like to introduce a video of the correction of the sinking floor in the gymnasium of an elementary school located in Miyagi Prefecture. The floor of the elementary school gymnasium has significantly sunk due to earthquakes and ground subsidence. This video explains the construction process of the Upcon method used in the gymnasium. The construction area is 665m2, and the construction period is 6 days. Please take a look. 【Site Information】 ■ Construction Area: 665m2 ■ Construction Period: 6 days ■ Maximum Sinking Amount: 133 ■ Maximum Void Amount: 90mm ■ Area: Miyagi Prefecture *For more details, please refer to the related links. For further information, please check the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Restoration Work of a Wooden House in Mihama 3-chome, Urayasu City, Chiba Prefecture

It was a satisfactory construction project! Here is an introduction to a case study of a wooden house slope restoration work.

Here is a case study of a wooden house slope restoration project. "Settlement correction work and liquefaction countermeasures are different things." "You must not abuse the foundation and the ground." "A shorter construction period is better." Based on these three points, we received the request from our client. We constructed a flat foundation over an area of 89m2 using a multi-point interval method. The construction period was 12 days. As a result, the work was satisfactory, and we received words of gratitude such as, "Each role was clear, and there was no waste in the flow of the entire construction process." [Case Overview] ■ Location: Mihama, Urayasu City, Chiba Prefecture ■ Building Name: Residence ■ Structure and Scale: Two-story wooden house ■ Foundation Structure: Flat foundation ■ Total Restoration Weight: Approximately 60 t *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Renovation and repair methods
  • Ground improvement
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to "Settlement Correction Works"

We offer ground renovations that withstand earthquakes!

"Subsidance correction work" refers to construction aimed at correcting the subsidence and deformation of buildings caused by changes in the ground due to ground subsidence, landslides, volume compression of embankments, and crustal movements due to earthquakes, in order to restore stability. By correcting buildings to be on solid ground, it not only helps to regain a comfortable and safe living environment but also contributes to the reduction of earthquake damage. [Types] ■ Steel pipe pile driving method ■ Pressure-resistant slab method ■ Combination of steel pipe pile driving method and pressure-resistant slab method ■ Foundation raising method ■ Void injection work *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Earthquake-resistant construction method
  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

What is sinking correction work?

By reinforcing buildings with a solid foundation, we can reduce earthquake damage!

"Settlement correction work" refers to the construction aimed at correcting the sinking and deformation of buildings caused by changes in the ground due to ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. Are there symptoms of sinking or deformation, such as "a ball rolling when placed on the floor" or "cracks in the building foundation"? Apple House can fix it. By correcting the building to a solid foundation, it is possible to reduce earthquake damage. We will jack up the tilt of the building to level it and restore a safe and comfortable living environment. [Features] ■ Reduces earthquake damage by correcting the building to a solid foundation. ■ Levels the tilt of the building by jacking it up, restoring a safe and comfortable living environment. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flexibly respond to ground and tilting conditions! 'List of Types of Settlement Repair Construction Methods'

The causes of subsidence are diverse! We propose construction methods tailored to the current ground conditions.

"I feel like my house is leaning..." If that's the case, please consult Apple House. The causes of sinking can vary widely, including earthquakes, ground subsidence, and construction defects. We propose methods tailored to the current ground conditions, including the "Steel Pipe Pile Press-in Method" to correct the tilt and prevent further sinking, as well as the "Pressure-Resistant Slab Method" and the "Foundation Lifting Method." Additionally, we have a model of sinking correction work on display at our headquarters. If you would like to visit, please feel free to contact us. 【Types of Methods】 ■ Steel Pipe Pile Press-in Method ■ Pressure-Resistant Slab Method ■ Combined Method of Steel Pipe Pile Press-in and Pressure-Resistant Slab ■ Foundation Lifting Method *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction and pile extraction work

We will solve any ground-related issues in case of emergency. "The house is leaning" "I want to remove the piles."

We will serve as a consultation point in the event of any uneven settlement and provide support until resolution. We also offer guarantees after settlement correction. Additionally, we accept orders for the extraction of existing piles.

  • Other earthworks, foundation works, and exterior floors
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ichida Construction Co., Ltd. Company Profile

We propose construction methods tailored to your situation! Leave your sinking correction work to us.

Ichida Construction Co., Ltd. conducts subsidence correction work to restore the tilt of buildings (structures) that have sunk back to their original horizontal position. The causes of ground subsidence and differential settlement can be attributed to various factors, such as excessive groundwater extraction, expansion or renovation on soft ground, and earthquakes. Once subsidence occurs, it does not return to its original height, leading to the destruction of the building (structure) and damage to buried utilities (electricity, gas, water, etc.). Our company proposes construction methods tailored to the customer's situation. 【Construction Methods】 ■ Load-bearing slab method ■ Underpinning method ■ Side pinning method ■ Foundation raising method ■ Chemical injection method ■ Foundation crack repair and reinforcement (aramid fiber) *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Presentation of Useful Materials for Subsidence Correction Work" Explanation of "What is Ground Subsidence

Localized subsidence occurs when it is associated with carpentry work or when a load exceeds the ground bearing capacity.

"Ground subsidence" refers to the phenomenon where the ground is compressed and sinks. Widespread ground subsidence primarily occurs due to excessive pumping of groundwater for industrial use, agricultural use, snow melting, air conditioning, and the extraction of natural gas, among other reasons. Localized subsidence occurs in cases related to civil engineering works or when loads exceed the bearing capacity of the ground. *For more details, please refer to the PDF materials or feel free to contact us.*

  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Presentation of Useful Materials for Subsidence Correction Work: Explanation of the Underpinning Method

Not only correct the sinking of the building, but also prevent further sinking! Construction can be carried out while occupied.

The "underpinning method" is commonly used in settlement repair work, where the load of the building is supported by steel pipe piles driven into the foundation using jacks, allowing for the entire building to be corrected. It prevents re-settlement and allows for construction to be carried out while residents remain in the building, without the need to move out. There is minimal noise, vibration, and dust generation, and the space required for equipment storage is also minimized. 【Features】 ■ The load of the building is supported by steel pipe piles driven into the foundation using jacks, correcting the entire building. ■ Construction can be carried out while residents remain in the building, without the need to move out. ■ Minimal noise, vibration, and dust generation. ■ Space-efficient equipment storage. *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The gaps in the windows and doors are concerning... the cause might be "ground movement"!

The cause of doors that won't close completely and gaps that won't fill may be the "tilt of the building"! We can solve your concerns by correcting the tilt through "settlement repair work"!

"The door doesn't close properly." "There is a half-open gap in the window." Do you have such concerns? The cause may be the "tilting" due to changes in the building's foundation. "Settlement correction work" is a construction process to fix the sinking or deformation of buildings caused by ground subsidence, landslides, volume compression of fill, or crustal movements due to earthquakes, in order to restore stability. If such tilting is left unaddressed, it may lead to extensive repairs later on, or there is a possibility of significant damage during natural disasters such as earthquakes, so early intervention is crucial. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method," "pressure-resistant slab method," and "foundation raising method," to correct the tilt and prevent re-sinking. Our company, which has numerous construction achievements, will guide you according to your concerns and the state of the ground and tilt. Additionally, we have a model of the settlement correction work on display at our headquarters. If you wish to visit, please feel free to contact us. 【Types of Methods】 ■ Steel pipe pile driving method ■ Pressure-resistant slab method ■ Combined method of steel pipe pile driving and pressure-resistant slab ■ Foundation raising method *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Are you having trouble with "puddles in the garden" that don't drain well? 'Settlement Repair Work'

A fundamental review is necessary for "puddles" caused by earthquakes and ground changes! Subsidence correction work to repair building foundations and deformations *Free inspections available.

"The puddle in the garden won't dry up..." "The ground is loose, and liquefaction is occurring." Do you have such concerns? The cause may be due to "ground changes" caused by earthquakes and other factors. "Subsidence correction work" is a construction process to fix the subsidence and deformation of buildings caused by ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method" to correct tilting and prevent further subsidence, as well as the "pressure-resistant slab method" and the "foundation raising method." We will provide guidance based on your housing concerns and the state of the ground and tilting. Additionally, we have a model of subsidence correction work displayed on our headquarters premises. If you wish to visit, please feel free to contact us. [Types of Methods] ■ Steel Pipe Pile Driving Method ■ Pressure-Resistant Slab Method ■ Combined Steel Pipe Pile Driving and Pressure-Resistant Slab Method ■ Foundation Raising Method *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Presentation of Useful Materials for Settlement Correction Work" Explanation of "What is Settlement Correction Work

We present helpful materials that clearly explain terminology and various construction methods!

"Subsidence correction work" refers to the construction process that involves applying steel pipes or chemical injections to buildings that have tilted due to ground subsidence, in order to bring the buildings closer to a level position. The PDF document below provides clear explanations from terminology to various methods, so please take a look. *For more details, please refer to the PDF document or feel free to contact us.*

  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Presentation of Useful Materials for Settlement Correction Work: Explanation of 'Load-Bearing Slab Method'

Lay a pressure plate (iron plate) under the foundation and use a jack to support the foundation and correct the tilt!

The "Pressure-resistant slab method" is a construction technique used when the surface layer is relatively hard, the weak layer is shallow, and the supporting layer is relatively shallow. Excavate 40 to 50 cm from the bottom of the foundation and install the pressure-resistant slab. Support the foundation with a jack to correct any tilt. 【Process Flow】 (1) Foundation excavation and pressure-resistant slab installation - Excavate 40 to 50 cm from the bottom of the foundation - Install the pressure-resistant slab (2) Pressure confirmation - Confirm pressure using a gauge-equipped jack (3) Jack installation - Support with the actual jack *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Presentation of Useful Materials for Settlement Correction Work: Explanation of Ground Improvement 'Chemical Injection Method'

Relatively inexpensive and can be constructed in a short period of time! We also offer helpful materials that clearly explain various construction methods!

The "liquid injection method" can be applied to shallow foundations. It is relatively inexpensive and can be constructed in a short period of time. The PDF document below provides easy-to-understand explanations of terms related to settlement correction work, as well as various methods, so please take a look. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sinking Correction Method: Steel Pipe Pile Driving and Load-Bearing Plate Method (Combined Method)

Construction using a combination of steel pipe piles and a bearing plate! It is suitable for cases of settlement due to volume compression of the fill.

The "Steel Pipe Pile Driving and Pressure Distribution Slab Method (Combined Method)" is a sinking correction method used in cases of settlement due to volume compression of fill soil. Construction is carried out using a combination of steel pipe piles and pressure distribution slabs. By correcting the building to a solid foundation, it is possible to reduce earthquake damage. The tilt of the building is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable for cases of settlement due to volume compression of fill soil ■ Construction using a combination of steel pipe piles and pressure distribution slabs ■ Reduces earthquake damage by correcting the building to a solid foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

For those troubled by sloping floors! Foundation repair work for floors where spheres roll!

Marbles and golf balls rolling around... The cause of that floor, which should be level, may be due to changes in the ground. Before it worsens, start with a free consultation.

"The ball rolls on what should be a level floor..." Do you have such concerns? The cause is likely due to the "tilt" of the building caused by ground changes. "Settlement repair work" is the construction to correct the sinking and deformation of buildings caused by ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method" to correct the tilt and prevent re-sinking, as well as the "pressure-resistant slab method" and the "foundation raising method." We will guide you according to your housing concerns and the state of the ground and tilt. Additionally, we have a model of settlement repair work on display at our headquarters. If you wish to visit, please feel free to contact us. [Types of Methods] ■ Steel Pipe Pile Driving Method ■ Pressure-Resistant Slab Method ■ Combined Steel Pipe Pile Driving and Pressure-Resistant Slab Method ■ Foundation Raising Method *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method
  • Subsidence correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration